Application Notes

Steam Control Solution at Medical Center

Job Note: Steam Control Solution at Medical Center

  Prominent Hospital Philadelphia, PA Construction Costs: $10K     Services Provided Instrument Programming &Configuration HMI Screen Development On-Site Start-Up &Commissioning Operator Training Neal Systems Provides Steam Distribution Control Panel […]

HTI Cover App note

Hazardous Area Control System Installation & Design

HTI Hydrocarbon Technology & Innovation, LLC Pilot Plant Facility – Lawrenceville, NJ Construction Costs: $400K HTI’s mission is to offer world class catalytic solutions, technical consultation, engineering design and services […]

WWTP Job Note

Job Note: Large Waste Water Treatment Plant Scada Upgrade

  Waste Water Treatment PlantNortheast, USAConstruction Costs: $250K Large Waste Water Treatment PlantNortheast, USAConstruction Costs: $350K Services Provided   SCADA Systems Remote I/O Racks & OIT’s PAC Control System Wireless […]

App Note Flare System Retrofit (1)

Application Note: Monitoring Methane at a Landfill

Flare System RetrofitA Turnkey Solution Problem Outdated Control System for Flare Operation A landfill customer was in need of a new control system for their flare operation— a secondary disposal […]

Wide Area Wireless Network Upgrade

Job Note: Wide Area Wireless Network Upgrade

  Passaic Valley Sewerage Commission Newark, NJ Construction Costs: $30K     Services Provided Wireless I/O Radio & Cellular Site Survey Network Infrastructure Consultation Data Acquisition Instrumentation Consultation Wireless Communications […]

Job Note Header (1)

Job Note: Waste Water Treatment Plant Scada Upgrade

  Waste Water Treatment PlantNortheast, USAConstruction Costs: $250K Waste Water Treatment PlantNortheast, USAConstruction Costs: $250K Services Provided SCADA Systems Remote I/O Racks & OIT’s PAC Control System Wireless Communication Systems […]

on-site

A SEAMLESS UPGRADE: FRESH WATER TREATMENT PLANT

UPGRADING WITH LIMITED DOWNTIME A critical fresh water treatment plant, Borough of Coudersport, required an upgrade to their existing Process Automation Control (PAC) System installed at their north and east […]

Untitled design (3)

Application Note: Water Treatment SCADA Upgrade

  Abstract A water treatment company in north-central PA had an 11 year old Foxboro PAC control system (Schneider Electric’s Eurotherm company made these controllers for Foxboro).  The municipality has […]

E-Newsletter Sign Up